EtherTap
A 5-coil converter, tested before it is trusted.
A first bench prototype was built and logged in 2021. We do not claim it creates energy: conservation of energy applies, and the question is how efficient the architecture can become, and whether it offers advantages in cost, size or reliability. Performance figures have not been independently verified, and we publish results either way.
Evidence before enthusiasm.
Most extraordinary energy claims fail on measurement, not on funding. Our process is built around that.
Independent measurement
Calibrated power analyzers, control rigs, closed-loop runs and an engineer with no stake in the result.
Published results
Raw data and reports are shared, including negative ones, so claims never run ahead of evidence.
Staged capital
Funding is released in stages, only as each gate is passed, so risk stays small until the answer is known.
Led by Sachin Chitre.
Talk to us.
Investors, laboratories, metrology engineers and potential partners are welcome to write.